The decision to merge the state port operators PT Pelindo I-IV into Pelindo last year (October 1, 2021) has created a positive operational performance over some of Indonesia’s leading ports, and some data on port stay have proved it.
Data released by Sub-holding PT Pelindo Terminal Petikemas (SPTP), a sub-holding on container terminal operation, explained that in the first quarter (Q1 2022), the port stay of some leading container terminals at some ports nationwide has been getting more shortened significantly.
SPTP Corporate Secretary Widyaswendra gave some examples as quoted by kontan.co.id. The port stay of TPK (container terminal) Makassar has been down from 30 to 24 hours, thanks to a series of improvement efforts by the operator SPTP.
A series of improvement efforts for the terminal include standardization and digitization of business processes, better rearrangement of working hours for dockers (TKBM), and improvement of terminal related supporting equipment.
“A shorter port stay is expected to cut logistics costs,” Widyaswendra told kontan.co.id.
Performance improvements also have an impact on scheduled ship arrivals in berthing windows. The standardization of all SPTP terminals will support better ship schedules in berthing windows and minimize delays.
Widyaswendra explained that there is one shipping line having 2 berthing windows in Makassar – routing Makassar-Surabaya and Makassar-Semarang-Jakarta-Belawan, which had always been on schedule and never delayed anymore.
In addition to the TPK Makassar, an increase in operational performance was also recorded at the TPK Belawan. The port stays at the terminal improved from an average of 36 hours to an average of 20 hours. Likewise, TPK Ambon recorded a port stay from 72 to 36 hours.
In addition to the three container terminals, standardization efforts are also carried out in the other 27 SPTP terminals. “In the near future we will standardize services at TPK Sorong, TPK Pantoloan, TPK Perawang, TPK Kendari, and TPK Jayapura,” said Widyaswendra.
Faster Loading Unloading
Some contacted sources from shipping lines confirmed such container terminals’ performance, saying the loading-unloading process has getting faster and faster.
Head of Tanto Intim Line for Ambon Branch Vence Pattiwael revealed that the operational performance improvement at TPK Ambon experienced a significant improvement. He said, currently, the loading and unloading time for a 600-boxes vessel can be completed in approximately 36 hours.
“This is very much faster than earlier. We ever spent three days just unloading 200 containers. But, now it has been getting better. And what is most important is that the administrative services can be accessed by telephone. So, no need to queue,” he said as written by kontan.co.id.
“We have experienced loading and unloading of 200 containers that took more than 3 days, with the current system, of course, it is faster and most importantly for administrative services that can be accessed by telephone, there is no need to queue,” he explained.
Echoing the view, Head of PT Meratus Line for Makassar Branch Steven Kristanto said that the terminals have also improved their services in a customer complaint. TPK Makassar, he said, is more responsive in following up on complaints submitted by shipping lines. This helps to build trust from customers of shipping lines (Meratus Line).
“The loading and unloading activities at the Makassar TPK are currently also getting faster, the average can reach 50 container boxes per hour,” he said.

