Priok Targets Mandatory Shore Power Connection for Berths 208 – 210 Next Month

Tanjung Priok targets mandatory Shore Power Connection (SPC) next month (September 15, 2022) for some berths in a bid to support the port program to go green (green port). To realize the target, the port authority and the port electricity provider PT Energi Pelabuhan Indonesia (EPI) continue to do socialization.

The port authority explained that the mandatory SPC will start from some berths, from Berth 208 to Berth 210.

“This program (mandatory SPC) means to support the port to go green as the system will minimize emission from the vessels berthing at the port,” Capt. Wisnu Handoko, Head of Tanjung Priok Port Authority, said in his remark speech about the socialization of the mandatory SPC concept in Tanjung Priok this morning (Thursday, August 18, 2022).

Some key stakeholders from related departments and related associations joined today’s socialization event, including from Coordinating Ministry of Maritime Affairs and Investment, Directorate General of Sea Transportation, Bureau of Classification PT Biro Klasifikasi Indonesia, Priok Port Harbour Master, Pelindo Regional 2 Tanjung Priok, Indonesia National Shipowners’ Association (INSA) Chapter Jakarta, Indonesia Shipping Agents’ Association (ISAA), and from other related institutions.

Related Post:  SPMT Continues Upgrading Its Terminals to Be Dedicated toward Service Standardization

The adoption of mandatory SPC, according to Wisnu, is in line with MARPOL 73/78 Annex VI and the Regulation of Ministry of Transportation PM 29/2014 on Protection of Maritime Environment from Pollution.

This Shore Power Connection, he said, has been running at some berths since 2020. Vessels of some shipping lines, including PT Meratus Line and PT Salam Pacific Indonesia Lines (SPIL), have utilized this service (SPC).

As reported earlier, EPI has been running the SPC, also called shore to ship (STS) system in supplying electricity to vessels, at the port (Tanjung Priok) since 2020. The first supply was done on October 15, 2020.

EPI noted there are achievements and success stories for minimizing environmental pollution from this system. In addition, the SPC has created efficiency in shipping fuel consumption as the STS will help a vessel engine not to work during berthing at the port, thus minimizing fuel (marine fuel) consumption.

Related Post:  Tanjung Priok Container Throughputs in 2022 Reaches 6.4 Million TEUs

According to EPI, this will create cost efficiency for a shipping company by 15-30%.